The original kitchen was taken out in December 2016 along with the tiles off the walls. The sluice cupboard was divided into two parts, the back part housing the sink with bucket and cleaning brooms etc. The front part now housing the larder fridge.
A new floor laid making way for a fully installed stainless steel kitchen. It has a hot water boiler, to use for hot drinks with a small under counter fridge. The work top areas have been made deeper, giving more workable areas.
Positive feedback has been received to date.